Location: Chicago
606outdoordesign is a business in Chicago offering deck building and rooftop decks.
816 N Kostner Ave, Chicago, IL 60651
Start a rooftop deck brief with the building, roof and intended use together. Ask who will assess the existing conditions, select the surface and support system, and coordinate their interfaces. A preferred board or paver is one choice within that scope; it cannot settle the questions about the roof beneath it.
Showing 1–2 of 2 listings.
Location: Chicago
606outdoordesign is a business in Chicago offering deck building and rooftop decks.
816 N Kostner Ave, Chicago, IL 60651
Location: Chicago
JW Landscapes LLC is an outdoor garden design and construction business based in Chicago.
5218 N Damen Ave, Chicago, IL 60625
A pedestal’s published capacity does not establish the capacity of your roof. For its Versadjust system, Bison assigns the contractor responsibility for considering the structure’s ability to carry the involved static and live loads, along with whether insulation can resist crushing and damage to the waterproofing membrane. Read the Versadjust specification as requirements for that identified system, rather than a design assessment of a particular building.
Before requesting a layout, write down the proposed uses and features: seating, dining, planting, access routes and any other planned items. Ask what information the assessor needs about those choices and which decisions must wait for the assessment. Keep the resulting findings and proposed system in the same project brief.

Illustrative stock photograph: picnic tables, an umbrella and a glass guard show visible terrace choices. The photograph does not show the roof assembly beneath the boards.
The proposal should explain how the selected deck system will work with the actual roof, including drainage and the surface beneath its supports. For Versadjust, Bison requires positive drainage in the substrate immediately below the pedestals and calls for roofing-manufacturer-approved systems that meet the stated roof-system requirements. Those provisions appear in the system specification.
Ask the team to identify the existing roof assembly and document the proposed interface. Which materials contact the roof? Who confirms their compatibility? How will the design account for drain locations, and how will future inspection or maintenance access be addressed? Request drawings or other agreed deliverables that answer those questions for the selected system.
Avoid treating a surface photograph as evidence of waterproofing or drainage details. Keep a record of the proposed assembly and any roof-manufacturer requirements supplied for the project, so later substitutions can be reviewed against the same information.
Name the people responsible for building assessment, deck-system design and roof coordination before comparing installation proposals. Ask what each will deliver, where one role ends and another begins, and who resolves a conflict between the proposed deck and the roof-system requirements.
Wind responsibility also needs an explicit place in that discussion. Bison states that its pedestal system does not shield the underlying roofing system from wind or other loads; the underlying roof must resist the loads appropriate to the project. See the Versadjust specification. Ask the project’s design team how the chosen system and roof will be assessed, without assuming a component specification answers the whole question.
Describe access for people, materials and later maintenance in the brief. Ask whether the proposal includes access-related work or expects another party to provide it, and have those boundaries recorded.

Illustrative stock photograph: multilevel rear decks and switchback stairs show an access arrangement to discuss. This is not a view of a rooftop support system.
Compare assessment, design, roof coordination and installation together. An isolated surface or support-system quote leaves too many responsibilities unresolved.
| Part of the scope | Ask the proposal to identify |
|---|---|
| Existing conditions | Who assesses the structure and roof, and the deliverables included |
| Surface and supports | Named products, proposed assembly and substitution process |
| Roof interfaces | Responsibility for membrane protection, compatibility and drainage details |
| Access and removability | How installation access and later roof access are addressed |
| Design coordination | Who resolves load, wind and interface questions |
| Handover | Care information, exclusions and the parties providing any stated warranties |
The Illinois Attorney General recommends seeking written estimates based on the same work. Give companies for rooftop deck systems the same brief and ask them to identify unanswered assessment questions separately from priced installation work. Review those open items before treating proposals as directly comparable.
Enquiries through this directory are unavailable. Use each profile’s published contact details.