Skip to content

Deck building

A complete deck proposal should address the support and frame, walking surface, connection to the house or independent support, and any guards and stairs. Start with how you want to use the space, then ask the builder to explain the assembly needed for that layout.

Read the planning guide

Showing 745–768 of 827 listings.

Location: Chicago

PORCH LINE is a deck builder in Chicago and offers deck building.

4604 W Lawrence Ave, Chicago, IL 60630

Location: Naperville

Just My Handyman, Inc. is a contractor in Naperville and offers deck building and carpentry.

560 Stanhope Ct, Naperville, IL 60565

Location: Chicago

Roofing by Dad Exteriors is a roofing contractor and leak repair specialist in Chicago. Its roofing work includes flat, shingle and TPO systems.

2711 N Pulaski Rd Suite 200, Chicago, IL 60639

Location: Naperville

ProDeck Works LLC is a deck builder based in Naperville, serving the western Chicago suburbs.

1560 Wall St #304, Naperville, IL 60563

Location: Chicago

Deck & Porch Pro Chicago offers deck and porch repair, deck replacement, composite decks and front porch repairs.

929 N Avers Ave, Chicago, IL 60651

Location: Glen Ellyn

EURO DA LLC is a construction company in Glen Ellyn and offers deck building and carpentry.

241 S Ellyn Ave, Glen Ellyn, IL 60137

Location: Chicago

Mr. Porch, Inc is a porch and deck contractor in Chicago specializing in two-or-more-story wood porches and decks for multi-family projects only.

1467 N Elston Ave Ste 205, Chicago, IL 60642

Location: Oswego

Indigo Handyman Services is a handyman/handywoman/handyperson in Oswego and offers deck building, general contracting, remodeling and landscaping.

113 Main St, Oswego, IL 60543

Location: Yorkville

UpperDeck is a deck design and construction company in Yorkville specializing in custom decks and outdoor living spaces.

4045 Brady St, Yorkville, IL 60560

Location: Downers Grove

All Pro Deck Builders is a deck contractor in Downers Grove serving residential and commercial customers.

1045 Curtiss St, Downers Grove, IL 60515

What makes up a complete deck?

A complete deck combines its walking surface with the supporting frame and connections. Simpson Strong-Tie describes a continuous load path connecting load-carrying members through the house ledger or down to the foundation. Its separate ledger guidance identifies flashing and weatherproofing alongside structural connections. Ask who will assess those interfaces and show them in the proposed work. Deck assembly guidance; ledger connection guidance.

Product instructions also distinguish surface from structure. The TimberTech Composite installation guide says its decking is not a primary load-bearing member and cannot be installed over existing deck boards. That is guidance for the named product, not an assessment of your property. TimberTech Composite installation guide.

Low brown wood platform deck with integrated bench seating beside a light-sided garage, with lawn and leafy deciduous trees.

Illustrative stock photo: a low platform and built-in seating show two layout choices to discuss.

New construction, resurfacing or rebuilding?

Compare these options by identifying exactly what stays and what is replaced. For a new deck, request a complete proposed assembly. For existing work, ask the contractor to mark retained framing, replacement framing, surface boards, railings and stairs separately.

A surface-only proposal needs more than a new board selection. Trex describes its resurfacing procedure as conditional on a sound existing foundation and framing system, and calls for checking joist spacing and overall framing condition. Those conditions do not establish that your deck is suitable for resurfacing. Trex resurfacing instructions.

If competing proposals assume different amounts of retained structure, use the guide to repair, resurface or replace the deck before treating their totals as equivalent. Ask what can be assessed now and what remains unknown until existing material is removed.

Choices to settle before proposals

Settle the intended use and broad layout first, then request named material and access options. Sketch where you want a dining table, seating and a clear route between the house, deck and yard. Mark any preferred stair position and features you want retained.

Discuss wood deck choices and composite decking choices as separate product decisions. Ask for the proposed board product, finish, fastening approach and care information in writing. A photograph can communicate a preferred colour or layout; it does not specify a complete product system.

Overhead view of a timber deck wrapping a planted backyard with multiple seating areas and exterior stairs.

Illustrative stock photo: an overhead view makes seating areas, planted edges and stair routes easier to distinguish.

Roof-level projects need their own discussion. Start with rooftop deck planning rather than applying a backyard-deck brief unchanged.

From an initial brief to agreed work

Use one written brief to start each contractor conversation, then resolve responsibility before agreeing to construction. The Illinois Attorney General recommends defining job specifications before interviews, including materials, time frame and payment schedule. Illinois home-repair guidance.

Bring photographs of the existing area and a list of what you want to change. Ask who handles assessment and design, who confirms the requirements applying to the actual property, and which responsibilities remain yours. Request an explanation of access, removal, surrounding work and any conditions the proposal cannot yet settle.

At handover, ask for the selected products' care documents and an explanation of which party handles questions about workmanship versus products. To investigate providers, browse companies for complete deck construction and discuss the particular scope with each company.

Compare the same deck scope

Compare proposals line by line before comparing totals. The Illinois Attorney General recommends written estimates from several contractors based on the same work. Consumer checklist.

Proposal item What to clarify
Existing deck Removal, disposal and every component proposed for retention
Support and frame Assessment, proposed work and unresolved conditions
Surface and edges Named boards, fastening approach and edge treatment
Access Included stairs, railings and changes to the surrounding area
Responsibilities Assessment, design, property-specific approvals and subcontracted work
Changes and handover Written change process, exclusions, care documents and warranty issuer

Open wood deck beside a light-sided house, with wood baluster guardrails, stair opening, visible deck boards and autumn trees beyond.

Illustrative stock photo: boards, railings and a stair opening help separate surface choices from access details.

Where a row is missing, request clarification rather than filling it in yourself. A useful comparison records what each company has included, excluded or left conditional, so you can decide which proposal actually matches your intended project.